    Highland Farms Dressage Arena

    placeholder-1140x400

    The Rundown

    Building in the state of Oregon has a lot of pluses. Our crews are surrounded by beautiful scenery and, when they are done, our buildings really shine against the stunning wilderness backdrop.

    Feature Details

    • 72 ft x 140 ft (10,080 square feet)
    • Open walls on all four sides
    • HDG rigid steel frames
    • ExxoTec™ PVC fabric cladding on roof—white with tan trim
    • 13.5-foot sidewall clearance
    • 36-inch overhang extensions
    • ARV-2000 rooftop exhaust vents
    • 16 psf snow load, 100 mph wind speed, wind exposure C, seismic D
    • Building use: Dressage Arena
    Download Case Study

    Industry

    Equestrian

    Size

    10,080 sq ft

    Location

    Otis, OR

    Year

    2018

    Testimonials

    Legacy was very easy to work with.

    The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.

    Theo Gatsonis CM & Sons

    Legacy was the only company who could help us.

    Our salt is delivered by rail cars to a large pit next to the storage structure. A conveyor system hoists it from pit to building. Legacy was the only company we talked to that could supply trusses strong enough to support the conveyors.

    O.J. Rinehart

    Working with Legacy was great.

    Cost was the initial factor for selecting Legacy, but once we saw the engineering that goes into their design, we understood that could make it easy for us to expand the building in later phases. We also liked its compatibility with conventional construction. There are a lot of possibilities we could explore in the future. The guys who constructed the building worked under some really, really tough conditions, but they wrapped it up on the afternoon of Christmas Eve, and the building opened Christmas morning. Everyone was very responsive, and it was a pleasure to work with them. Once visitors got into the building and we experienced the interior environment with the heat flow and the insulation, we were very satisfied.

    Tom Tar Belleayre Mountain