DEK Superstars
Industry
Sports & Recreation
Size
15,360 sq ft
Location
Massapequa, NY
Year
2023
Subscribe to our Newsletter
Testimonials
The new building will protect the salt supply.
It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.
Legacy was the only company who could help us.
Our salt is delivered by rail cars to a large pit next to the storage structure. A conveyor system hoists it from pit to building. Legacy was the only company we talked to that could supply trusses strong enough to support the conveyors.
The whole engineering phase with Legacy was excellent.
They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.