Your Building.
Your Decision.

Expert guidance to evaluate materials, understand true building and operating costs, and advocate for solutions that serve your needs.

Don't Sit on the Sidelines of
Your Own Project.

You’re about to make one of the largest investments your organization will ever undertake. Yet many supplier project stakeholders may not fully understand your organization’s long-term operational needs or be aware of newer solutions that could deliver better performance or greater cost efficiency. As the industry evolves, new materials, technologies, and approaches continue to emerge—but professionals often lean toward the products and specifications they know best.

We help you participate as an informed decision-maker, equipped to evaluate materials and building layout designs objectively, ask the right questions, and advocate for solutions that truly serve your organization.

Buildings Designed for Your Operations

No Standardized Templates

No Standardized Templates

Standardized, pre-fabricated structures are not necessarily the simplest or even the cheapest solution. Your building should match your specific operational requirements—not force your operations to fit a standard structure.

Wide Span

Wide Span
Capabilities

Open span distances over 300 feet without interior columns maximize usable space, accommodate equipment movement, and provide flexibility for future layout changes. Straight walls allow easy access to every corner in bulk storage areas and efficiently accommodate warehouse racking.

Lower Operational Costs

Lower Operational
Costs

Our building envelope saves up-front cost on mechanical systems and delivers ongoing energy savings for the life of the building. Unique capabilities of the ExxoTec™ system can deliver air-tight, durable solutions with minimal maintenance requirements.

Future Proofing

Future-Proofing Your Investment

Your building needs to serve your business today and for decades to come. Legacy structures accommodate expansion without expensive modifications. Equipment changes, process updates, and technology integration are simpler when your building was designed for adaptability from the start.

Know What to Expect at Every Stage

Start Your Project ►
What to Expect IMG_0665

Featured Projects

Biomethane Production Office & Processing Building

19,200 sq ft Biomethane Waste-to-Energy Production Building

The Biomethane Facility features a tall peak for tipping trucks, a sealed envelope to contain odors, and clear-span space to store food waste for use.

View Projects
Biomethane Production Office & Processing Building

AGC Elizabethtown KY | Automotive Storage Solutions

16,482 sq ft Automotive Storage Structure | Elizabethtown, KY

AGC Elizabethtown KY - Explore our durable fabric structures for automotive storage.

View Projects
AGC Elizabethtown KY | Automotive Storage Solutions

Basin Electric Power Cooperative Bottom Ash Dewatering Facility

52,800 sq ft Coal-Fired Energy Plant Processing Remediation Building | Stanton, ND

The structure, built over a wastewater facility, protects equipment dewatering ash and features a ventilation system with six air replacements per hour.

View Projects
Basin Electric Power Cooperative Bottom Ash Dewatering Facility

BBE Hydro Vehicle Maintenance and Warehouse Buildings

30,800 sq ft Vehicle Maintenance and Warehouse Buildings | Thompson, MB

Explore BBE Hydro's project in Thompson, MB, serving the mining, oil, gas, and energy industries. Subscribe to our newsletter for more updates!

View Projects
BBE Hydro Vehicle Maintenance and Warehouse Buildings

North Dakota LNG Co.

6,860 sq feet Liquefied Natural Gas Processing

North Dakota LNG Co. facility in Tioga, ND: 6,860 sq ft, Class 1/Div. 2 compliant, 41 ft peak clearance, custom foundation, ventilation, and doors.

View Projects
North Dakota LNG Co.

Additional Resources

FAQs

Take Control of Your Building Decision

Connect with our services team to discuss material options, lifecycle costs, or how to navigate the architect-contractor decision process.

Start Your Project ►