Projects

    SRNS Craft Bldg

    placeholder-1140x400

    Industry

    Oil Gas & Energy

    Size

    7,000 sq ft

    Location

    Aiken, SC

    Year

    2024

    Testimonials

    The whole engineering phase with Legacy was excellent.

    They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.

    Dean Foor JC Biomethane

    Legacy met our challenges.

    Merging old materials with new materials—and then using unconventional construction—were among the challenges.

    Owner Vulpes Rec Center

    Legacy was the only company who could help us.

    Our salt is delivered by rail cars to a large pit next to the storage structure. A conveyor system hoists it from pit to building. Legacy was the only company we talked to that could supply trusses strong enough to support the conveyors.

    O.J. Rinehart
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.