    Atkinson Fertilizer

    placeholder-1140x400

    The Rundown

    Nebraska farmers rely on a steady supply of fertilizer to keep crops healthy and increase yields. Serving local farmers by providing high-quality dry fertilizer blends has led to steady growth for a local fertilizer supplier.

    Feature Details

    • 200 ft x 280 ft (56,000 sq ft)
    • Enclosed, exposure C, 35# snowload, seismic A, full exposure, 90 mph windload
    • Solid steel frames hot dip galvanized to ASTM A123 standards
    • 28 oz ExxoTec™ Elite PVC fabric – white with gray trim
    • ARV-2000 roof vents
    • 18-in overhangs with mesh soffit for ventilation
    • Multiple doorway openings for personnel & equipment
    • Solid steel bracing rods
    • Pier and curb foundation with CIP concrete stem walls
    • Installed by Legacy crews
    Download Case Study

    Industry

    Bulk Commodity

    Size

    56,000 sq ft

    Location

    Atkinson, NE

    Year

    2017

    Testimonials

    The Legacy construction crew was very professional and courteous.

    Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.

    Joe Bitter Alliant Energy/IEI Barge Services

    The tripper works just as planned – which basically doesn’t ever happen.

    The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.

    Greg Margeson Scrap Metal Recycling

    We had a great working relationship with Legacy

    A lot of the temporary structures in the region are fabric structures, so we mainly looked at those types of buildings. Due to the overall project timeline, the buildings had to be constructed in the dead of winter. We had a great working relationship with Legacy throughout the entire process. They supply a very high quality fabric structure, and we're certainly pleased with what we've seen from the buildings thus far.

    John Lehman BBE Hydro Constructors
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.