Projects

    Cameron Hubbs Construction Fort Smith

    placeholder-1140x400

    Industry

    Bulk Commodity

    Size

    30,000 sq ft

    Location

    Fort Smith, AR

    Year

    2024

    Testimonials

    It was a good experience working with Legacy.

    Our transportation system requires the diesel buses to be stored in a facility to keep them warm and protected from the elements. Legacy's customized fabric structure design was able to fit our purposes. Their in-house installation crew put up the building very quickly. They're easy to work with and willing to help, and the communication with the city and responsiveness throughout the project was very good.

    Joe Balge Davenport Department of Public Works

    Legacy met our challenges.

    Merging old materials with new materials—and then using unconventional construction—were among the challenges.

    Owner Vulpes Rec Center

    Legacy pricing is very compatible to your competitors.

    We needed something that would withstand the corrosive environment better than our current building. What first drew us to Legacy was the concept of the rigid steel frame with fabric. We feel the rigid frame will give us many more years of service than the open web structures. Legacy's attention to detail, answering of endless questions that we had and prompt response to those questions also played a role in our decision to go with Legacy. And because so many details were ironed out in the beginning we built a very good building with very few modifications to the scope during the building process. We felt you could deliver on what you were proposing. Another plus for going with Legacy was the fact you had crews who were MSHA trained and you already had an MSHA Contractor ID. Your crew worked efficiently and safely. Once we were assured the liner cavity could be vented properly, the liner option seems to be a great add on for our environment. It is very obvious this will help in reduction of dust resting on the trusses. We liked the fact this building could be built with no cables. Instead, we used hot dipped galvanized steel rods. We are very proud to have partnered with Legacy to construct our Salt Containment Structure. We feel we now have a long term solution to our salt storage needs, a building that will be around for a long time to come.

    Stephanie Murphy Lyons
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.