Projects

    Cargill Dodge City

    placeholder-1140x400

    Industry

    Bulk Commodity

    Size

    2,975 sq ft

    Location

    Dodge City, KS

    Year

    2021

    Testimonials

    The whole engineering phase with Legacy was excellent.

    They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.

    Dean Foor JC Biomethane

    The tripper works just as planned – which basically doesn’t ever happen.

    The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.

    Greg Margeson Scrap Metal Recycling

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.