Projects

    Detroit Salt

    placeholder-1140x400

    Industry

    Bulk Commodity

    Size

    28,800 sq ft

    Location

    Detroit, MI

    Year

    2020

    Testimonials

    Legacy was very easy to work with.

    The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.

    Theo Gatsonis CM & Sons

    Working with Legacy was great.

    Cost was the initial factor for selecting Legacy, but once we saw the engineering that goes into their design, we understood that could make it easy for us to expand the building in later phases. We also liked its compatibility with conventional construction. There are a lot of possibilities we could explore in the future. The guys who constructed the building worked under some really, really tough conditions, but they wrapped it up on the afternoon of Christmas Eve, and the building opened Christmas morning. Everyone was very responsive, and it was a pleasure to work with them. Once visitors got into the building and we experienced the interior environment with the heat flow and the insulation, we were very satisfied.

    Tom Tar Belleayre Mountain

    Legacy has superior installation value.

    Having designed the mechanical and electrical systems, as well as structural foundations for these types of buildings, we find that a Legacy fabric structure has superior insulation value compared to a pre-engineered metal structure with the same ‘R’ value of insulation.

    Terry Smith TWS President and CEO
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.