Projects

    Dockzilla SIA2 Building

    placeholder-1140x400

    Industry

    Automotive

    Size

    924 sq ft

    Location

    Ankeny, IA

    Year

    2024

    Testimonials

    It seemed to be the perfect solution.

    The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.

    Mark Edelmann Bethel Park

    Working with Legacy was easy.

    This is definitely a more permanent building type. And working with Legacy was easy – there was good communication throughout the design and installation process.

    Joe Gianvito Fern Hollow

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.