Dockzilla SPA1-2 Building
Industry
Automotive
Size
924 sq ft
Location
Philadelphia, PA
Year
2023
Subscribe to our Newsletter
Testimonials
Protecting this equipment helps it run more efficiently.
We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.
The tripper works just as planned – which basically doesn’t ever happen.
The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.
The Legacy construction crew was very professional and courteous.
Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.