Projects

    Five Rivers

    placeholder-1140x400

    Industry

    Bulk Commodity

    Size

    30,000 sq ft

    Location

    Van Buren, AR

    Year

    2021

    Testimonials

    The building provides a unique environment for attending a concert.

    And the sound quality inside is amazing. It's a terrific venue.

    Dan Mastronardi Creative Concerts

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.