Projects

    Stony Brook University College Athletics Facility

    placeholder-1140x400

    The Rundown

    Having a beautiful field house that fit into a traditional university setting was important to the college. It also had to fit into a rather limited footprint. Legacy used inverted legs on the solid steel frame to make it fit and to make it look great. It also attached to a traditional brick and mortar building seamlessly. Both engineers and designers got an 'A' for this project.

    Feature Details

    • Building size: 185 ft x 315 ft (58,275 sq ft)
    • Hot dip galvanized rigid steel frames
    • ExxoTec™ Elite PVC fabric on the exterior, customized with university athletics logo
    • Blue and white ExxoTec™ Pro interior fabric liner
    • Inverted steel I-beams
    • Full turf interior for football, lacrosse, soccer and softball
    • R30 insulation on sidewalls
    • Lighting, filming platform and divider curtains supported by frame
    • Limited building footprint
    • Connected to office building
    • 20 psf ground snow load, 130 mph wind speed, seismic zone B
    Download Case Study

    Industry

    Sports & Recreation

    Size

    58,275 sq ft

    Location

    Stony Brook, NY

    Year

    2018

    Testimonials

    It was a good experience working with Legacy.

    Our transportation system requires the diesel buses to be stored in a facility to keep them warm and protected from the elements. Legacy's customized fabric structure design was able to fit our purposes. Their in-house installation crew put up the building very quickly. They're easy to work with and willing to help, and the communication with the city and responsiveness throughout the project was very good.

    Joe Balge Davenport Department of Public Works

    The set up was ideal.

    With this Legacy design, we were able to save money and space by integrating a wash bay into the storage structure. The setup we use is also ideal for eliminating environmental concerns, since all the salt-laden water is contained instead of running off.

    Steve McAvoy INDOT

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.