    The DeLong Company, Inc.

    placeholder-1140x400

    The Rundown

    With a history dating back to 1913, The DeLong Company, Inc. is a family-run enterprise that offers creative and cost-effective solutions for various sectors, including coal, transport, farming, and retail. They specialize in wholesale, agronomy (seed and fertilizer), and export services.

    With 37 coast-to-coast facilities, DeLong’s maritime export facility to Port Milwaukee on Jones Island was a welcome addition to Wisconsin and Wisconsin’s agriculture community. With export providing DeLong’s main portion of the business, the Great Lake Region was an opportunity for expansion with new agricultural opportunities.

    Feature Details

    • 120 ft x 580 ft DDGS Storage Facility (69,600 sq ft)
    • Rigid steel frame finished with EpoxxiShield™ Standard frame finishing
    • White and green ExxoTec™ Elite PVC fabric cladding
    • 18-in black mesh soffit overhang with 58 white ARV-2000 roof vents 
    • Four 4-ft x 4-ft mesh vents on each endwall
    • Two 14-ft x 16-ft coil overhead doors and four standard walk doors
    • Precast pier foundation with precast walls
    • Water mitigation system with green oversized gutters and white downspouts
    • 1,000-lb/ft conveyor system supported by the building’s frames 
    • 30,000-ton building storage capacity
    • 105 mph wind load, 30 psf ground snow load, exposure D, seismic B 
    Download Case Study

    Industry

    Bulk Commodity, Ports & Waterways

    Size

    69,600 sq ft

    Location

    Jones Island, WI at Port Milwaukee

    Year

    2021

    Testimonials

    Everything that Legacy said they were going to do, they did.

    We obviously had contracts, but the overall feel was kind of like the olden days, where you felt you could just take somebody at their word. Price is a major factor in any purchase decision. But we didn't blink at having to pay a little more for the Legacy structure. Sometimes you have to spend more to get a higher quality building. The installation was very smooth. Legacy's in-house crew worked in cold winter conditions, and they erected the building within five days. They were a very professional group, and I'd highly recommend them. We like the sidewall columns going straight up instead of curving down like in our hoop buildings. First off, it lets us put more product in there. And our front-end loaders can get much closer to the walls and drive straight down the sides. It gives us more working room and increases our efficiency. In the long run I think this will be a building that requires less maintenance. Legacy was so outstanding to work with that I didn't even bother looking at pricing elsewhere.

    Marty Shell Five Rivers

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers

    The Legacy construction crew was very professional and courteous.

    Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.

    Joe Bitter Alliant Energy/IEI Barge Services
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.