Case Study

Chillicothe Correctional Institution
Wastewater Treatment Dewatering Structure

6,550 sq ft Tension Fabric Building for Wastewater Treatment
Chillicothe, OH

Chillecothe Correctional Institution - Wastewater - Tension Fabric

The Rundown

This industrial fabric building for biosolid dewatering facility is attached to an existing brick building. The wastewater treatment building has a passive ventilation system and hot dip galvanized frame to prevent damage from corrosion.

Customer Success

“It was a priority to get the new building operating quickly so we could continue our programming. They were totally committed to doing whatever was necessary to support our project.”

Steve Henry | OKC Tennis Center

“Everyone at Legacy was responsive and super friendly throughout the process. The estimate was what we wanted, they gave us a realistic timeframe, and the style of the building gives us more useable space and a more robust frame than the other options we considered. Construction was so easy – the crews showed up and were completely self-contained. The entire project was boom – done – easy.”

Kelly Fisher | Training & Exercise Coordinator and Field Operations Specialist for Hennepin County Emergency Management

Feature Details

  • Building size: 65.5 feet x 100 feet
  • Hot dip galvanized steel frame with 15 oz. flame-retardant fabric
  • Frames and purlins support conveyor weight
  • 1.5 foot overhangs with mesh soffit ventilation
  • Pier foundation installed by others
  • Designed with sealed attachment to an existing brick structure
  • Installed by Legacy crews under strict correctional facility security
  • Meets OBC 11/IBC 09, NFPA 701 Code, wind exposure C, seismic zone B, partially enclosed, fully exposed, standard occupancy
  • Building use: Wastewater treatment – biosolid dewatering