    Central Valley Ag Co-Op (CVA) operates fertilizer storage, mixing and distribution facilities across the Midwest. After a storm permanently damaged a corroded fertilizer storage building in Tamora, Nebraska, CVA set out to replace the building with a safe, efficient enclosure.

    Feature Details

    • 120 ft x 480 ft structure
    • Hot dip galvanizing rigid steel frame system mounted on existing concrete walls
    • Non-FR PE fabric on exterior with interior PE fabric liner
    • Two engineered flat gable end-walls
    • Framed and wrapped fabric openings for free-standing conveyor and catwalk
    • 18-in eaves with black mesh ventilation
    • Icebreakers along both both sidewalls
    • Aluminum louvers on endwalls and sidewalls
    • ARV cavity and roof vents
    • 25 lbs snow load, 105 mph windspeed, exposure C, seismic zone B, fully enclosed, S2 low hazard construction, fully exposed
    Download Case Study

    Industry

    Bulk Commodity

    Size

    56,600 sq ft

    Location

    Tamora, NE

    Year

    2016

    Testimonials

    The Legacy construction crew was very professional and courteous.

    Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.

    Joe Bitter Alliant Energy/IEI Barge Services

    Legacy was very easy to work with.

    The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.

    Theo Gatsonis CM & Sons

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.