<img alt="" src="https://secure.perceptive-innovation-ingenuity.com/793281.png" style="display:none;">
    Projects

    CH2M CWI Idaho

    placeholder-1140x400

    The Rundown

    CH2M-WG Idaho, LLC has added a 3,000 sq ft tension fabric structure in Scoville, Idaho, designed and installed by Legacy Building Solutions. This purpose-built facility meets stringent site and operational requirements, including high roof snow loads, wind resistance, and specialized clearances for equipment like gantry cranes.

    The building was engineered to deliver exceptional durability and functionality on a non-earth penetrative foundation, ensuring minimal site disruption. With features tailored to support industrial operations, this structure showcases Legacy’s commitment to innovative design and installation expertise.

    Feature Details

    • 50 ft x 60 ft (3,000 sq ft)
    • 30 psf roof snow load
    • 115 mph windspeed
    • 33 ft interior sidewall clearance for gantry crane
    • 46 ft peak clearance
    • 1.6 ft overhangs with mesh soffits for ventilation
    • One 16 ft x 14 ft steel coil overhead door
    • Two personnel doors with egress, panic, and closer hardware
    • Non-earth penetrative megablock foundation installed on an asphalt pad
    • Designed and installed by Legacy Building Solutions' expert crews
    Download Project Profile

    Industry

    Size

    Location

    Year

    Testimonials

    Amazing amount of light.

    You stand inside and have this amazing amount of light. It’s hard for me to imagine that anyone would want to have a metal roof over them.

    Lynda Krogh Highland Farms

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers

    The whole engineering phase with Legacy was excellent.

    They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.

    Dean Foor JC Biomethane
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.