Projects

    Chadron Aquatic and Wellness Center

    placeholder-1140x400

    The Rundown

    Residents of Chadron, Nebraska, enjoyed using an outdoor pool during the summer months. When an indoor pool at Chadron State College needed replacement, the college and the city joined forces to build a modern indoor pool that would be open to all.

    Feature Details

    • 162 ft x 170 ft (27,540 sq ft)
    • Hot dip galvanized rigid steel frames
    • Flame-retardant fabric customized with tan, white and custom blue wave design
    • 36-inch overhangs with icebreakers and gutters in door locations
    • R-30 insulation with thermal break and 12 oz. fabric interior liner
    • 30 psf ground snow load, 90 mph wind speed, wind exposure C, seismic zone A
    • Legacy crews installed the building over an existing pool and structure and provided wrapped openings for doors, windows, HVAC and aquatic equipment
    Download Case Study

    Industry

    Sports & Recreation

    Size

    27,540 sq ft

    Location

    Chadron, NE

    Year

    2016

    Testimonials

    Working with Legacy was great.

    Cost was the initial factor for selecting Legacy, but once we saw the engineering that goes into their design, we understood that could make it easy for us to expand the building in later phases. We also liked its compatibility with conventional construction. There are a lot of possibilities we could explore in the future. The guys who constructed the building worked under some really, really tough conditions, but they wrapped it up on the afternoon of Christmas Eve, and the building opened Christmas morning. Everyone was very responsive, and it was a pleasure to work with them. Once visitors got into the building and we experienced the interior environment with the heat flow and the insulation, we were very satisfied.

    Tom Tar Belleayre Mountain

    Legacy was very easy to work with.

    The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.

    Theo Gatsonis CM & Sons

    It was a seamless process.

    The crew was so professional, polite, on time and hardworking. It was amazing to see how much they got done. There were weather delays and they still finished early. It was a seamless process, and a pleasure to work with this group.

    Andrew Morley AGC Automotive
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.