Chillicothe Correctional Institution WWT & Dewatering Structure

6,550 sq ft Wastewater Treatment Dewatering Structure

Attached to a brick building, this structure protects a wastewater facility with frames for a conveyor system and passive ventilation for humidity control.

The Rundown

This industrial fabric building for biosolid dewatering facility is attached to an existing brick building. The wastewater treatment building has a passive ventilation system and hot dip galvanized frame to prevent damage from corrosion.

FEATURE DETAILS

  • Building size: 65.5 ft x 100 ft
  • Hot dip galvanized steel frame with flame-retardant fabric
  • Frames and purlins support conveyor weight
  • 18-in overhangs with mesh soffit ventilation
  • Pier foundation installed by others
  • Designed with sealed attachment to an existing brick structure
  • Installed by Legacy crews under strict correctional facility security
  • Meets OBC 11/IBC 09, NFPA 701 Code, wind exposure C, seismic zone B, partially enclosed, fully exposed, standard occupancy
  • Building use: Wastewater treatment – biosolid dewatering

Project Location