Projects

    Punta Patche

    placeholder-1140x400

    The Rundown

    The mine in Chile is a vast sprawling copper mine, and we are installing a building to store copper concentrate in port before it is moved to ships. The scale of this building is impressive, and the conveyor system supported by our roof frame is the heaviest we have ever worked with. The corrosion issue is that copper concentrate reacts chemically with galvanizing, so that was not even an option. Our Epoxxishield perfectly met their specs and requirements. The mine in Chile is a vast sprawling copper mine, and we are installing a building to store copper concentrate in port before it is moved to ships. The scale of this building is impressive, and the conveyor system supported by our roof frame is the heaviest we have ever worked with. The corrosion issue is that copper concentrate reacts chemically with galvanizing, so that was not even an option. Our Epoxxishield perfectly met their specs and requirements.

    Industry

    Size

    8,274 sq ft

    Location

    Punta Patache, Chile

    Year

    2018

    Testimonials

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers

    Everything that Legacy said they were going to do, they did.

    We obviously had contracts, but the overall feel was kind of like the olden days, where you felt you could just take somebody at their word. Price is a major factor in any purchase decision. But we didn't blink at having to pay a little more for the Legacy structure. Sometimes you have to spend more to get a higher quality building. The installation was very smooth. Legacy's in-house crew worked in cold winter conditions, and they erected the building within five days. They were a very professional group, and I'd highly recommend them. We like the sidewall columns going straight up instead of curving down like in our hoop buildings. First off, it lets us put more product in there. And our front-end loaders can get much closer to the walls and drive straight down the sides. It gives us more working room and increases our efficiency. In the long run I think this will be a building that requires less maintenance. Legacy was so outstanding to work with that I didn't even bother looking at pricing elsewhere.

    Marty Shell Five Rivers

    It was a breath of fresh air.

    No one was really expecting your guys to install it as fast as they did. Once we got to that point where it was time to put the steel up and putting the fabric up…it was a breath of fresh air.

    Adam McLeod Stony Brook University
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.