Projects

    Punta Patche

    placeholder-1140x400

    The Rundown

    The mine in Chile is a vast sprawling copper mine, and we are installing a building to store copper concentrate in port before it is moved to ships. The scale of this building is impressive, and the conveyor system supported by our roof frame is the heaviest we have ever worked with. The corrosion issue is that copper concentrate reacts chemically with galvanizing, so that was not even an option. Our Epoxxishield perfectly met their specs and requirements. The mine in Chile is a vast sprawling copper mine, and we are installing a building to store copper concentrate in port before it is moved to ships. The scale of this building is impressive, and the conveyor system supported by our roof frame is the heaviest we have ever worked with. The corrosion issue is that copper concentrate reacts chemically with galvanizing, so that was not even an option. Our Epoxxishield perfectly met their specs and requirements.

    Industry

    Size

    8,274 sq ft

    Location

    Punta Patache, Chile

    Year

    2018

    Testimonials

    The whole engineering phase with Legacy was excellent.

    They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.

    Dean Foor JC Biomethane

    They met all our safety requirements and did an excellent job.

    Legacy’s crew was extremely professional. They met all our safety requirements and did an excellent job. They even provided an extensive final completion checklist with pictures of each item. That was very impressive, and it really demonstrated the level of workmanship they expected of themselves.

    Jerry Pinder Thalle Construction

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.