    Friendship Equestrian Recover

    placeholder-1140x400

    The Rundown

    Friendship Equestrian Center (FEC), a boarding and training facility in upstate New York, has an 80 ft x 200 ft fabric riding arena used for year-round training, riding and dressage practice, originally installed in 2004. After a short time using the original building, the staff and customers at FEC noticed mildew growth along the walls and ceiling of the arena. As the mildew problem worsened over time and some microtears in the building started affecting the climate inside, staff knew it was time to replace the cover on the building.

    Feature Details

    • Hudson, New York
    • 80 ft x 200 ft Riding Arena
    • Recovered using ExxoTec™ fabric
    Download Case Study

    Industry

    Size

    16,000 sq ft

    Location

    Hudson, NY

    Year

    Testimonials

    It was a breath of fresh air.

    No one was really expecting your guys to install it as fast as they did. Once we got to that point where it was time to put the steel up and putting the fabric up…it was a breath of fresh air.

    Adam McLeod Stony Brook University

    We were very impressed by their engineering team.

    By today's standards, the buildings we're designing are of world-class caliber in the U.S. and Canada. Legacy offered several features that put them at the top of the list. They are unique among fabric buildings in that they build on a rigid steel frame. Everything looked good, from the eave and ridge ventilation system to the method for installing fabric panels. Combined with material delivery times and the time to construct, Legacy seemed like the perfect choice for our application. "The whole design is very efficient for our operations. Flexibility is key, especially when the building is a 'first of its kind' for the industry. We had one design change after the whole plan was in place, to widen our trapeze in the structure that supports the conveyor, and Legacy was able to make that change without any problem. The conveyor system fits and operates just as it was designed. "Legacy knew our schedule and saved us over 30 days of downtime. They stood the frames for the entire fabric structure in a single day, and everything - conveyors, electrical, fabric - was completed within five weeks of them coming to the site. It was a Herculean effort on Legacy's part. It was fantastic. They have a very passionate team, from top to bottom. In all respects, from design to pricing to production, Legacy is one of the best building contractors I've ever worked with. I look forward to working with them again.

    Mike Miller Source Energy Services

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.