    Friendship Equestrian Recover

    placeholder-1140x400

    The Rundown

    Friendship Equestrian Center (FEC), a boarding and training facility in upstate New York, has an 80 ft x 200 ft fabric riding arena used for year-round training, riding and dressage practice, originally installed in 2004. After a short time using the original building, the staff and customers at FEC noticed mildew growth along the walls and ceiling of the arena. As the mildew problem worsened over time and some microtears in the building started affecting the climate inside, staff knew it was time to replace the cover on the building.

    Feature Details

    • Hudson, New York
    • 80 ft x 200 ft Riding Arena
    • Recovered using ExxoTec™ fabric
    Download Case Study

    Industry

    Size

    16,000 sq ft

    Location

    Hudson, NY

    Year

    Testimonials

    The whole engineering phase with Legacy was excellent.

    They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.

    Dean Foor JC Biomethane

    The extended life span of a Legacy building over competitors was also a main factor.

    The finished interior was a key factor in ultimately choosing Legacy, as well as the simplicity of the solution and the relocatability. The extended life span of a Legacy building over competitors was also a main factor in choosing Legacy.

    Project Manager Camp Lemonnier

    Legacy was one of the only companies that could construct to that height.

    We needed a structure this big to be able to do maintenance inside, and we needed something we could erect quickly and meet all our requirements. Legacy was one of the only companies that could construct to that height.

    Jason Berzansky US Steel