    FWS Fertilizer Storage

    placeholder-1140x400

    The Rundown
    Fabric cladding, a hot-dip galvanized steel frame and a passive ventilation system make this terminal building ideal for corrosive storage.

    Industry

    Size

    58,800 sq ft

    Location

    Carseland, Alberta, Canada

    Year

    2014

    Testimonials

    The Legacy construction crew was very professional and courteous.

    Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.

    Joe Bitter Alliant Energy/IEI Barge Services

    It's kind of like being outside all the time but still having shade.

    I love the amount of sunlight that you still get through the roof. It stays pretty warm in the winter and cooler in the summer. It͛s very quiet inside. When you get rain or hail or wind, there's no banging or clanging, no sharp or rough sounds. The acoustics are good. It's fresh and dry and clean. You don't ever have condensation dripping off the roof. It's a controlled environment, yet you still get the benefit of the daylight coming in.

    Joel Marr

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.