<img alt="" src="https://secure.perceptive-innovation-ingenuity.com/793281.png" style="display:none;">
    Projects

    Highland Farms Dressage Arena

    placeholder-1140x400

    The Rundown

    Building in the state of Oregon has a lot of pluses. Our crews are surrounded by beautiful scenery and, when they are done, our buildings really shine against the stunning wilderness backdrop.

    Feature Details

    • 72 ft x 140 ft (10,080 square feet)
    • Open walls on all four sides
    • HDG rigid steel frames
    • ExxoTec™ PVC fabric cladding on roof—white with tan trim
    • 13.5-foot sidewall clearance
    • 36-inch overhang extensions
    • ARV-2000 rooftop exhaust vents
    • 16 psf snow load, 100 mph wind speed, wind exposure C, seismic D
    • Building use: Dressage Arena
    Download Case Study

    Industry

    Equestrian

    Size

    10,080 sq ft

    Location

    Otis, OR

    Year

    2018

    Testimonials

    The tripper works just as planned – which basically doesn’t ever happen.

    The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.

    Greg Margeson Scrap Metal Recycling

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.