    The Rundown

    Building in the state of Oregon has a lot of pluses. Our crews are surrounded by beautiful scenery and, when they are done, our buildings really shine against the stunning wilderness backdrop.

    Feature Details

    • 72 ft x 140 ft (10,080 square feet)
    • Open walls on all four sides
    • HDG rigid steel frames
    • ExxoTec™ PVC fabric cladding on roof—white with tan trim
    • 13.5-foot sidewall clearance
    • 36-inch overhang extensions
    • ARV-2000 rooftop exhaust vents
    • 16 psf snow load, 100 mph wind speed, wind exposure C, seismic D
    • Building use: Dressage Arena
    Download Case Study

    Industry

    Equestrian

    Size

    10,080 sq ft

    Location

    Otis, OR

    Year

    2018

    Testimonials

    We had a great working relationship with Legacy

    A lot of the temporary structures in the region are fabric structures, so we mainly looked at those types of buildings. Due to the overall project timeline, the buildings had to be constructed in the dead of winter. We had a great working relationship with Legacy throughout the entire process. They supply a very high quality fabric structure, and we're certainly pleased with what we've seen from the buildings thus far.

    John Lehman BBE Hydro Constructors

    The tripper works just as planned – which basically doesn’t ever happen.

    The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.

    Greg Margeson Scrap Metal Recycling

    Working with Legacy was great.

    Cost was the initial factor for selecting Legacy, but once we saw the engineering that goes into their design, we understood that could make it easy for us to expand the building in later phases. We also liked its compatibility with conventional construction. There are a lot of possibilities we could explore in the future. The guys who constructed the building worked under some really, really tough conditions, but they wrapped it up on the afternoon of Christmas Eve, and the building opened Christmas morning. Everyone was very responsive, and it was a pleasure to work with them. Once visitors got into the building and we experienced the interior environment with the heat flow and the insulation, we were very satisfied.