Projects

    Marine Harvest

    placeholder-1140x400

    The Rundown
    The fish operation included the Influent Treatment Building, the Effluent Filter Building and the Post Smolt Facility. All of the building structures required a corrosion-resistant finish on the steel that we supplied using our Epoxxishield Paint System.

    Industry

    Size

    157,144 sq ft

    Location

    Stephenville, Newfoundland, Canada

    Year

    2020

    Testimonials

    Legacy Building Solutions has given Solar Ship more than just a state-of-the-art hangar and assembly building.

    Through our close collaboration, their design incorporates a self-reliant photovoltaic power package that sits above the fabric roof, allowing our building operations to be entirely off-grid. In addition, Legacy’s foundation design allowed us to re-use an existing concrete pad, saving us time and money during construction. These innovations were part of our top-level requirements, and delivering on them really sets Legacy apart from the traditional building segment.

    Lewis Reford Solar Ship

    Working with Legacy was great.

    Cost was the initial factor for selecting Legacy, but once we saw the engineering that goes into their design, we understood that could make it easy for us to expand the building in later phases. We also liked its compatibility with conventional construction. There are a lot of possibilities we could explore in the future. The guys who constructed the building worked under some really, really tough conditions, but they wrapped it up on the afternoon of Christmas Eve, and the building opened Christmas morning. Everyone was very responsive, and it was a pleasure to work with them. Once visitors got into the building and we experienced the interior environment with the heat flow and the insulation, we were very satisfied.

    Tom Tar Belleayre Mountain

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.