    Marine Harvest

    placeholder-1140x400

    The Rundown
    The fish operation included the Influent Treatment Building, the Effluent Filter Building and the Post Smolt Facility. All of the building structures required a corrosion-resistant finish on the steel that we supplied using our Epoxxishield Paint System.

    Industry

    Size

    157,144 sq ft

    Location

    Stephenville, Newfoundland, Canada

    Year

    2020

    Testimonials

    We had a great working relationship with Legacy

    A lot of the temporary structures in the region are fabric structures, so we mainly looked at those types of buildings. Due to the overall project timeline, the buildings had to be constructed in the dead of winter. We had a great working relationship with Legacy throughout the entire process. They supply a very high quality fabric structure, and we're certainly pleased with what we've seen from the buildings thus far.

    John Lehman BBE Hydro Constructors

    We were very impressed by their engineering team.

    By today's standards, the buildings we're designing are of world-class caliber in the U.S. and Canada. Legacy offered several features that put them at the top of the list. They are unique among fabric buildings in that they build on a rigid steel frame. Everything looked good, from the eave and ridge ventilation system to the method for installing fabric panels. Combined with material delivery times and the time to construct, Legacy seemed like the perfect choice for our application. "The whole design is very efficient for our operations. Flexibility is key, especially when the building is a 'first of its kind' for the industry. We had one design change after the whole plan was in place, to widen our trapeze in the structure that supports the conveyor, and Legacy was able to make that change without any problem. The conveyor system fits and operates just as it was designed. "Legacy knew our schedule and saved us over 30 days of downtime. They stood the frames for the entire fabric structure in a single day, and everything - conveyors, electrical, fabric - was completed within five weeks of them coming to the site. It was a Herculean effort on Legacy's part. It was fantastic. They have a very passionate team, from top to bottom. In all respects, from design to pricing to production, Legacy is one of the best building contractors I've ever worked with. I look forward to working with them again.

    Mike Miller Source Energy Services

    It seemed to be the perfect solution.

    The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.

    Mark Edelmann Bethel Park
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.