    Mining Building Application

    placeholder-1140x400

    The Rundown
    The 18,200 sq ft mining building was designed and manufactured by Legacy Building Solutions but installed by a Tech rep in Indonesia.

    Industry

    Size

    18,200 sq ft

    Location

    Sorowako, South Sulawesi, Indonesia

    Year

    2012

    Testimonials

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency

    They met all our safety requirements and did an excellent job.

    Legacy’s crew was extremely professional. They met all our safety requirements and did an excellent job. They even provided an extensive final completion checklist with pictures of each item. That was very impressive, and it really demonstrated the level of workmanship they expected of themselves.

    Jerry Pinder Thalle Construction