    MN Native Landscapes

    placeholder-1140x400

    The Rundown

    Keeping snow off the equipment at Minnesota Native Landscapes makes daily operations more efficient during long Minnesota winters. A fabric building for cold storage keeps all heavy equipment ready for use at a moment’s notice.

    Feature Details

    • Building size: 120 ft x 180 ft (21,600 sq ft)
    • 50 psf snow load, 106 mph windspeed, wind exposure C, seismic zone A, fully enclosed, full exposure, low occupancy
    • Gray primed steel frames
    • Tan ExxoTec™ Elite PVC fabric cladding with white roof
    • Standard 18-in overhangs with mesh soffit
    • Overhead and walk doors on each endwall
    • Uninsulated building for cold storage and abundant natural light
    • Installed by Legacy crews
    Download Case Study

    Industry

    Size

    21,600 sq ft

    Location

    Ostego, MN

    Year

    2017

    Testimonials

    The extended life span of a Legacy building over competitors was also a main factor.

    The finished interior was a key factor in ultimately choosing Legacy, as well as the simplicity of the solution and the relocatability. The extended life span of a Legacy building over competitors was also a main factor in choosing Legacy.

    Project Manager Camp Lemonnier

    It was a breath of fresh air.

    No one was really expecting your guys to install it as fast as they did. Once we got to that point where it was time to put the steel up and putting the fabric up…it was a breath of fresh air.

    Adam McLeod Stony Brook University

    Everything that Legacy said they were going to do, they did.

    We obviously had contracts, but the overall feel was kind of like the olden days, where you felt you could just take somebody at their word. Price is a major factor in any purchase decision. But we didn't blink at having to pay a little more for the Legacy structure. Sometimes you have to spend more to get a higher quality building. The installation was very smooth. Legacy's in-house crew worked in cold winter conditions, and they erected the building within five days. They were a very professional group, and I'd highly recommend them. We like the sidewall columns going straight up instead of curving down like in our hoop buildings. First off, it lets us put more product in there. And our front-end loaders can get much closer to the walls and drive straight down the sides. It gives us more working room and increases our efficiency. In the long run I think this will be a building that requires less maintenance. Legacy was so outstanding to work with that I didn't even bother looking at pricing elsewhere.

    Marty Shell Five Rivers
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.