<img alt="" src="https://secure.perceptive-innovation-ingenuity.com/793281.png" style="display:none;">
    Projects

    Pontotoc Sands: Frac Sand and Proppant Storage Solutions

    placeholder-1140x400

    The Rundown

    Pontotoc Sands Company is a supplier of sand and aggregates for fracking and industry. The increase in fracking activity near their El Reno, Oklahoma location required additional space to store and distribute sand.

    Feature Details

    • Building size: 80 ft x 100 ft
    • Wide flange rigid steel frames
    • Gray primed steel components
    • PE fabric – white with tan
    • Eco attachment system – single panel double-layered and laced to all fabric-contacting steel members
    • 10 ft above grade CIP concrete wall
    • Fabric direct bolt terminated to exterior of CIP wall
    • Built to IBC 2015 criteria
    • Two 48 ft x 48 ft fix-bladed aluminum louvers framed and installed in end wall
    • 10 psf snow load, 105 mph windspeed, exposure C, seismic zone B, collateral 1 psf, enclosed, fully exposed, low occupancy
    • Building use: Frac sand and proppant storage
    Download Case Study

    Industry

    Bulk Commodity

    Size

    8,000 sq ft

    Location

    El Reno, OK

    Year

    2017

    Testimonials

    They met all our safety requirements and did an excellent job.

    Legacy’s crew was extremely professional. They met all our safety requirements and did an excellent job. They even provided an extensive final completion checklist with pictures of each item. That was very impressive, and it really demonstrated the level of workmanship they expected of themselves.

    Jerry Pinder Thalle Construction

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency

    Legacy was very easy to work with.

    The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.

    Theo Gatsonis CM & Sons
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.