Projects

    Rosewood Stables

    placeholder-1140x400

    The Rundown
    The owner of a Cover-All Titan series 2 tension fabric building had some wear and tear over the years. Legacy recovered the 80x100 riding with 12 oz PE fabric.

    Industry

    Size

    8,000 sq ft

    Location

    Kemptville, Ontario

    Year

    2017

    Testimonials

    The Legacy construction crew was very professional and courteous.

    Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.

    Joe Bitter Alliant Energy/IEI Barge Services

    Legacy pricing is very compatible to your competitors.

    We needed something that would withstand the corrosive environment better than our current building. What first drew us to Legacy was the concept of the rigid steel frame with fabric. We feel the rigid frame will give us many more years of service than the open web structures. Legacy's attention to detail, answering of endless questions that we had and prompt response to those questions also played a role in our decision to go with Legacy. And because so many details were ironed out in the beginning we built a very good building with very few modifications to the scope during the building process. We felt you could deliver on what you were proposing. Another plus for going with Legacy was the fact you had crews who were MSHA trained and you already had an MSHA Contractor ID. Your crew worked efficiently and safely. Once we were assured the liner cavity could be vented properly, the liner option seems to be a great add on for our environment. It is very obvious this will help in reduction of dust resting on the trusses. We liked the fact this building could be built with no cables. Instead, we used hot dipped galvanized steel rods. We are very proud to have partnered with Legacy to construct our Salt Containment Structure. We feel we now have a long term solution to our salt storage needs, a building that will be around for a long time to come.

    Stephanie Murphy Lyons

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.