<img alt="" src="https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fsecure.perceptive-innovation-ingenuity.com%2f793281.png&amp;c=E,1,cVWb3ONniAlDlNWF2yGLX1Pu2WoXcj4VdEZrGpVWBuy0HFnzdTmQ0092CBaaLP-9kb5fQu4aUpN7ArnPFHbGez75leEP_6roXWIL3Jw3iw,,&amp;typo=1" style="display:none;">
    Projects

    Two Military Aviation Hangars

    placeholder-1140x400

    The Rundown
    Two military hangers were requested by an Andersen Airforce Base in Guam. Each hanger was 170x100 totaling 17,000 sq ft of hanger space and engineered to withstand 195 mph wind speeds.

    Industry

    Size

    17,000 sq ft

    Location

    Guam

    Year

    2019

    Testimonials

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers

    Legacy pricing is very compatible to your competitors.

    We needed something that would withstand the corrosive environment better than our current building. What first drew us to Legacy was the concept of the rigid steel frame with fabric. We feel the rigid frame will give us many more years of service than the open web structures. Legacy's attention to detail, answering of endless questions that we had and prompt response to those questions also played a role in our decision to go with Legacy. And because so many details were ironed out in the beginning we built a very good building with very few modifications to the scope during the building process. We felt you could deliver on what you were proposing. Another plus for going with Legacy was the fact you had crews who were MSHA trained and you already had an MSHA Contractor ID. Your crew worked efficiently and safely. Once we were assured the liner cavity could be vented properly, the liner option seems to be a great add on for our environment. It is very obvious this will help in reduction of dust resting on the trusses. We liked the fact this building could be built with no cables. Instead, we used hot dipped galvanized steel rods. We are very proud to have partnered with Legacy to construct our Salt Containment Structure. We feel we now have a long term solution to our salt storage needs, a building that will be around for a long time to come.

    Stephanie Murphy Lyons

    It was a good experience working with Legacy.

    Our transportation system requires the diesel buses to be stored in a facility to keep them warm and protected from the elements. Legacy's customized fabric structure design was able to fit our purposes. Their in-house installation crew put up the building very quickly. They're easy to work with and willing to help, and the communication with the city and responsiveness throughout the project was very good.

    Joe Balge Davenport Department of Public Works
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.