    City of Clinton Municipal Salt Storage Facility

    placeholder-1140x400

    The Rundown

    Legacy designed, engineered, manufactured and installed a municipal salt storage facility in Clinton, IA. The structure features 12-ft high precast walls with a pier foundation as well as Legacy's exclusive EpoxxiShield™ COR Pro steel finishing, which helps to protect the building's frames from the corrosive salt.

    Feature Details

    • Building size: 80 ft x 100 ft (8,000 sq ft)
    • All framing members factory finished with EpoxxiShield™ COR Pro
    • White and tan ExxoTec™ Elite PVC fabric cladding
    • Passive ventilation through 18-in mesh soffits, 3 white ARV-2000 roof vents and two black 4 ft x 4ft white louver endwall vents
    • 12 ft high precast walls with pier foundation on three sides
    • Installed by Legacy crews
    Download Project Profile

    Industry

    State & Municipal

    Size

    8,000 sq ft

    Location

    Clinton, IA

    Year

    2021

    Testimonials

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency

    The set up was ideal.

    With this Legacy design, we were able to save money and space by integrating a wash bay into the storage structure. The setup we use is also ideal for eliminating environmental concerns, since all the salt-laden water is contained instead of running off.

    Steve McAvoy INDOT

    It seemed to be the perfect solution.

    The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.

    Mark Edelmann Bethel Park
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.