Projects

    Cosma – Montezuma

    placeholder-1140x400

    Industry

    Bulk Commodity

    Size

    9,600 sq ft

    Location

    Montezuma, IA

    Year

    2023

    Testimonials

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers

    Your install team is first rate.

    I asked you to give us a very aggressive timeline and you delivered on that. Your team obviously consists of "can do" personnel and always worked to find a solution for every problem we addressed during the project. We asked for no subsurface disruption and your team delivered a well-engineered solution at a reasonable cost. Your install team is first rate, both with their work ethic and desire to deliver a superior product. The building that they installed is outstanding. We did our walk-through this morning and from our VP down, it was all compliments. I would personally recommend a Legacy Building to anyone. Thank you for everything.

    Doug Holbrook CH2M-WG Idaho, LLC

    It was a seamless process.

    The crew was so professional, polite, on time and hardworking. It was amazing to see how much they got done. There were weather delays and they still finished early. It was a seamless process, and a pleasure to work with this group.

    Andrew Morley AGC Automotive
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.