Dockzilla SFL9 Bldg A
Industry
Automotive
Size
1,120 sq ft
Location
Miramar, FL
Year
2025
Subscribe to our Newsletter
Testimonials
The whole engineering phase with Legacy was excellent.
They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.
Great service over many years.
The facility looks great and it is very photogenic, which is important since we get a lot of media coverage.
Working with Legacy was easy.
This is definitely a more permanent building type. And working with Legacy was easy – there was good communication throughout the design and installation process.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.