Dockzilla SWA5 Bldg
Industry
Automotive
Size
1,120 sq ft
Location
Tukwila, WA
Year
2025
Subscribe to our Newsletter
Testimonials
Legacy was the only one that could do a two-stepped building.
Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.
The tripper works just as planned – which basically doesn’t ever happen.
The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.
Legacy was very easy to work with.
The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.