Highland Water Reclamation Facility
Industry
State & Municipal
Size
20,400 sq ft
Location
Highland, IL
Year
2019
Subscribe to our Newsletter
Testimonials
Legacy was one of the only companies that could construct to that height.
We needed a structure this big to be able to do maintenance inside, and we needed something we could erect quickly and meet all our requirements. Legacy was one of the only companies that could construct to that height.
Legacy Building Solutions has given Solar Ship more than just a state-of-the-art hangar and assembly building.
Through our close collaboration, their design incorporates a self-reliant photovoltaic power package that sits above the fabric roof, allowing our building operations to be entirely off-grid. In addition, Legacy’s foundation design allowed us to re-use an existing concrete pad, saving us time and money during construction. These innovations were part of our top-level requirements, and delivering on them really sets Legacy apart from the traditional building segment.
Legacy was the only company who could help us.
Our salt is delivered by rail cars to a large pit next to the storage structure. A conveyor system hoists it from pit to building. Legacy was the only company we talked to that could supply trusses strong enough to support the conveyors.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.