<img alt="" src="https://secure.perceptive-innovation-ingenuity.com/793281.png" style="display:none;">
    Projects

    I-66 EMP/VDOT Salt Storage Facility

    placeholder-1140x400

    Industry

    State & Municipal

    Size

    8,000 sq ft

    Location

    Manassas, VA

    Year

    2021

    Testimonials

    Legacy was the only company who could help us.

    Our salt is delivered by rail cars to a large pit next to the storage structure. A conveyor system hoists it from pit to building. Legacy was the only company we talked to that could supply trusses strong enough to support the conveyors.

    O.J. Rinehart

    Legacy was the only one that could do a two-stepped building.

    Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.

    James Kessler Ontario Airport (ONT)

    The tripper works just as planned – which basically doesn’t ever happen.

    The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.

    Greg Margeson Scrap Metal Recycling
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.