It seemed to be the perfect solution.
The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.
Mark Edelmann
Bethel Park
Legacy met our challenges.
Merging old materials with new materials—and then using unconventional construction—were among the challenges.
Owner
Vulpes Rec Center
Legacy was very easy to work with.
The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.
Theo Gatsonis
CM & Sons