Neuse River Resource Recovery Facility Final Cake Storage Facility
Industry
Waste & Recycling
Size
17,250 sq ft
Location
Raleigh, NC
Year
2021
Subscribe to our Newsletter
Testimonials
The set up was ideal.
With this Legacy design, we were able to save money and space by integrating a wash bay into the storage structure. The setup we use is also ideal for eliminating environmental concerns, since all the salt-laden water is contained instead of running off.
They met all our safety requirements and did an excellent job.
Legacy’s crew was extremely professional. They met all our safety requirements and did an excellent job. They even provided an extensive final completion checklist with pictures of each item. That was very impressive, and it really demonstrated the level of workmanship they expected of themselves.
It seemed to be the perfect solution.
The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.