<img alt="" src="https://secure.perceptive-innovation-ingenuity.com/793281.png" style="display:none;">
    Projects

    Neuse River Resource Recovery Facility Final Cake Storage Facility

    placeholder-1140x400

    Industry

    Waste & Recycling

    Size

    17,250 sq ft

    Location

    Raleigh, NC

    Year

    2021

    Testimonials

    The set up was ideal.

    With this Legacy design, we were able to save money and space by integrating a wash bay into the storage structure. The setup we use is also ideal for eliminating environmental concerns, since all the salt-laden water is contained instead of running off.

    Steve McAvoy INDOT

    They met all our safety requirements and did an excellent job.

    Legacy’s crew was extremely professional. They met all our safety requirements and did an excellent job. They even provided an extensive final completion checklist with pictures of each item. That was very impressive, and it really demonstrated the level of workmanship they expected of themselves.

    Jerry Pinder Thalle Construction

    It seemed to be the perfect solution.

    The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.

    Mark Edelmann Bethel Park
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.