North Side Elevator
Industry
Bulk Commodity
Size
25,200 sq ft
Location
Loyal, WI
Year
2019
Subscribe to our Newsletter
Testimonials
It seemed to be the perfect solution.
The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.
Your install team is first rate.
I asked you to give us a very aggressive timeline and you delivered on that. Your team obviously consists of "can do" personnel and always worked to find a solution for every problem we addressed during the project. We asked for no subsurface disruption and your team delivered a well-engineered solution at a reasonable cost. Your install team is first rate, both with their work ethic and desire to deliver a superior product. The building that they installed is outstanding. We did our walk-through this morning and from our VP down, it was all compliments. I would personally recommend a Legacy Building to anyone. Thank you for everything.
The new building will protect the salt supply.
It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.
Start Your Project
Partnerships Equal Structural Integrity
Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.