Windsor Salt Ojibway Mine Warehouse
Industry
Bulk Commodity
Size
73,600 sq ft
Location
Windsor, ON
Year
2025
Subscribe to our Newsletter
Testimonials
Working with Legacy was easy.
This is definitely a more permanent building type. And working with Legacy was easy – there was good communication throughout the design and installation process.
The new building will protect the salt supply.
It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.
Legacy was the only one that could do a two-stepped building.
Legacy was the only one that could do a two-stepped building, so we could have a high part in front …and then have it stepped down, so we stay out of the clearance zone.