Waste Recycling Sludge
Drying Facility Building

12,800 sq ft Tension Fabric Sludge Drying Facility
Loveland, Colorado

Project Profile

The Rundown

Wastewater treatment is more efficient in a clearspan fabric building. The natural light helps with the sludge drying process. Legacy Building Solutions designed and installed this structure to owner specifications.

Customer Success

“It was a priority to get the new building operating quickly so we could continue our programming. They were totally committed to doing whatever was necessary to support our project.”

Steve Henry | OKC Tennis Center

“Everyone at Legacy was responsive and super friendly throughout the process. The estimate was what we wanted, they gave us a realistic timeframe, and the style of the building gives us more useable space and a more robust frame than the other options we considered. Construction was so easy – the crews showed up and were completely self-contained. The entire project was boom – done – easy.”

Kelly Fisher | Training & Exercise Coordinator and Field Operations Specialist for Hennepin County Emergency Management

Feature Details

  • Building size: 80 feet x 160 feet
  • 20-foot x 20-foot overhead door and one walk/man door
  • Custom designed 15-foot straight leg height to accommodate equipment clearances
  • Soffit ventilation and 4 endwall mesh vents
  • Building and modified concrete foundation were designed and stamped by Legacy, to be integrated with a partially completed foundation
  • Hot dip galvanized frames
  • 30 lb. snow load, 95 mph wind, low hazard use
  • Building was delivered and installed on time
  • Building use: Sludge Drying Facility

Request Information

Learn more about our extensive capabilities by filling out our form!

Request Information

Get In Touch